PLTMH (Pembangkit Listrik Tenaga Mikro Hidro) UMM meraih Runner Up Energy ASEAN Awards 2009 Link Terkait : www.umm.ac.id
There is non-grid area in the south korea. and we are supposed to make home's non-grid micro-hydro electric system. Now, we are limiting the water because of generator capacity... So, first all, we must be make the turbine, and we plan to drow to banki drawing, and cutting, welding,,, at last, making the banki turbine....and then, we buy the old ups for non-grid electric system, reference,,,, in korea,,, very be able to purchase the old ups,,,, and batteries... System specification. 1. Turbine: bankt turbine - Water quantity: 16-30[Litter/Second] - Turbine Dia. 400[mm] - Penstock Dia. 200[mm] - Penstock Length: 104[m] - Penstock Height: 16[m] 2.Generating system - Out put: about 2[kW] - Speed: about 270[rpm] - PMG Generator - Voltage: 220[V], 3Phase, Pole:56p 3. Control Systm - UPS for Non-grid electric system. 4. Battery Back up system - 12[ V ]DC, 16[each] - Total voltage: 192[ V ]DC. - Battery cap. 125[AH] 5.Loads: Refrigator, Refrigator for KIMCH, Lighting, Computer, Audio-video system, Washing meachine, Tv, and vacuum cleaner, Hair driyer, Iron,,, etc... We are using the all the Electric loads..... 6. Monthly electric generating qualtities: about 1080[kWh/Month] Rink : cafe.naver.com E-mail: sehonggima@naver.com the more..
Video Rating: 4 / 5
No comments:
Post a Comment